On November 21st, Unit 9 of Wudongde Hydropower Station completed all grid-related tests and officially entered 72-hour trial operation, and the countdown to power generation began. It is reported that the Wudongde Hydropower Station has a total of 12 850,000-kilowatt hydroelectric generating units on the left and right banks, with a total installed capacity of 10.2 million kilowatts. It is the fourth giant hydropower station in my country and the seventh in the world to enter the ranks of ten million kilowatts.