Recently, two units of the Uzbekistan hydropower station transformation project undertaken by China Power Construction Corporation have been successfully connected to the grid for power generation. So far, the Tashkent Cascade Hydropower Station No. 9 Power Station, the Lower Bozsui Cascade Hydropower Station No. 14 Power Station, and the Shahlihan Cascade Hydropower Station No. 2 Power Station are all connected to the grid as scheduled during the year.