In order to be deployed for offshore wind installation, the crane setup of the BT-220IU unit has been optimised. With its 140 m long boom and 2600 Mt lifting capacity, the new LEC enables OIM Wind to install the next and future generation’s wind turbine generators and foundations safely and efficiently. At the highest position, the crane’s main hoist is capable of lifting the maximum load of 2600 Mt with a hook height of approximately 165 m above main deck level.