Search

Power Grid

Thursday
01 Dec 2022

ADB Launches Grid-Connected Hybrid Renewable Energy in Mongolia

01 Dec 2022  by asian-power.com   

Source: Asian Development Bank

The Asian Development Bank (ADB) has launched a hybrid renewable energy system in Mongolia.

The hybrid system includes a 5-megawatt solar photovoltaic project and a 3.6-megawatt-hour battery energy storage system that has been connected to Mongolia’s grid.

Byekbolat Khalik, Head of Renewable Energy Division of the Ministry of Energy said the project allows 48,000 consumers across over 8,000 households in the the Altai-Uliastai region to clean and reliliable energy.

“In addition to reduced electricity loss and improved quality of and access to electricity, the system is estimated to cut 223,813 tons of carbon dioxide emissions over the next 25 years.”

The system can provide about 8.8 million kilowatt-hour solar-generate and 1.3 million kWh charged and discharged energy in yhr Altai-Uliastai energy system.
 

Keywords

More News

Loading……