"The first generating unit of BelNPP has been taken out of service for the latest scheduled preventative maintenance. [...] As part of the planned measures at the first unit of the BelNPP, there will be a partial loading of fresh nuclear fuel at the reactor, and the equipment of the reactor system, turbine generator, main circulation pumps and other equipment and process systems will be inspected," the ministry said.