The project is located in central Bohai Sea, with an average water depth of approximately 23 meters. The main production facilities include a wellhead platform, with 10 development wells planned to be commissioned. The project is expected to achieve a peak production of approximately 5,800 barrels of oil equivalent per day in 2026.
CNOOC Limited holds 100% interest in this project and acts as the operator.