The seismic survey officially started in the evening of 4 November 2024 and will continue until the 20th of December. The surveys started south of Münster and will gradually move to the north. The progress of the seismic survey and information on which areas will be covered are provided at the webpage of Stadtwerke Münster.
The operations are being headed by local utility Stadtwerke Münster, along with experts from the companies DMT-Group, IPS, Erdwerk, and GGL. The survey seeks to identify the water-bearing limestone layers that can be the potential host formation for a geothermal reservoir. In the future, the city of Münster aspires to extract geothermal energy for climate-neutral heating as with the plan that has been in place since 2021. In 2022, the city council of Münster voted unanimously in favor of developing geothermal energy as a mainstay of the city’s heat supply.