According to reports, the development includes the placement of 43 wind turbines on private land located between Vivoratá and Coronel Vidal; and is currently in the public participation stage, a key step to obtain the necessary permits.
The wind turbines will be connected by 33 kV collector networks that will transport the generated energy to the Coronel Vidal transformer station (33/132 kV).
The park will have an installed capacity of 266.6 MW and its wind turbines are 6.2 MW each.
In addition to the wind turbines, the project includes the construction of internal roads to facilitate access to the installation areas, as well as the foundations and assembly platforms necessary for its operation.
It should be noted that the company Genneia recently inaugurated the La Elbita park in Tandil, on a large property near the border with Lobería that has 36 wind turbines.
The energy transition, fundamental in the fight against the climate crisis, already has precedents in Mar Chiquita and in the southeast of Buenos Aires. In the district governed by Walter Wischnivetzky, a wind farm was launched some time ago in the northern urban area of ??Vivoratá, which can be seen from Route 2 on the way to Mar del Plata.