As part of FEED Phase 1, ABB will work alongside Aker Solutions on the complete electrical study for the facility, including system design and high voltage equipment. ABB will lead the electrical infrastructure development, including integrated automation and telecommunications systems for the offshore platform and onshore substation. ABB will also manage the integration of renewable energy into the grid, deploying advanced power and energy management systems to optimise operations.