The 1.1 GW Inch Cape project site is located in the Scottish North Sea, 15 kilometres off the Angus coast, and will comprise 72 wind turbine generators. Seaway7’s scope of work includes the transport and installation of 18 pin-pile jacket foundations and 54 transition pieces, with offshore works expected to commence in 2026. Inch Cape Offshore Limited is a joint venture between ESB and Red Rock Renewables.