At the Kunnar-12 well, after a reassessment of the well’s potential through production optimization, OGDCL deployed a rig to replace the conventional Jet Pump with an Electrical Submersible Pump (ESP). These measures have increased production at the well from 1,060 BPD to 1,820 BPD, an increase of 760 BPD. The well is part of OGDCL’s Kunnar Oil Field, with a 100% working interest in Kunnar Mining Lease Area.
Kunnar-6 well, previously shut-in due to high water production and low oil recovery, has been successfully revived following a comprehensive plan.