Topside Installed for Norway's Nova Field
12 May 2020 by NaturalGasWorld
Wintershall Dea's Nova field will be tied back to a platform at the Neptune Energy-operated Gjoa field. Nova is due to start production in late 2021 from two subsea templates connected with the Gjoa platform.