Search
Oil & Gas
Coal
Thermal Power
Solar
Wind Power
Hydropower
Nuclear Power
Power Grid
Hydrogen
Geothermal
Energy Storage
Energy Efficiency
New Energy Vehicles
Energy Economy
Climate Change
Biomass Energy
Video
Policy & Regulation
Exhibition & Forum
Organization
Belt and Road
Tianwan 7
Nuclear Reactor
Reactor Vessel in Place at Tianwan 7
The reactor vessel has been installed at unit 7 of the Tianwan nuclear power plant in China's Jiangsu province. Russia is constructing two VVER-1200 reactor…
Nuclear Reactor
Reactor vessel arrives for Tianwan 7
The reactor vessel for unit 7 of Tianwan nuclear power plant in Jiangsu province, China, has arrived at the site after a two month journey by sea from Russia.Ti…
Nuclear Power Plant (NPP)
Upper Inner Containment Dome Installed at Tianwan 7
The upper part of the inner containment dome has been installed at unit 7 of China’s Tianwan NPP, which is being built with the assistance of Rosatom&rsqu…
Nuclear Power Plant (NPP)
Upper Part of Inner Dome Installed at Tianwan 7
The 214-tonne upper part of the inner containment dome, with a diameter of 36 metres, has been installed in its design position at Tianwan nuclear power plant u…
Nuclear Power Plant (NPP)
Further Progress at Tianwan 7
The lower tier of liner of the inner containment dome for the reactor building for unit 7 of China’s Tianwan NPP has been installed, China National Nuclea…
Nuclear Power Plant
Core Catcher Casing in Place at Xudabao 3 and Tianwan 7
The core catcher casing has been installed for two Russian-supplied VVER-1200 reactors being constructed in China.
Nuclear Power Plant
Russia Assembles Upper Half-Shell of the Reactor for Tianwan 7
Russia’s AEM-Technologies has assembled the upper half-shell of the reactor for unit 7 of the Tianwan NPP in China
Nuclear Power Plant
Atommash Assembles Lower Half of Tianwan 7 Reactor
The Volgodonsk branch of Atommash AEM-Technologies has assembled the lower half-shell of the reactor for unit 7 of China’s Tianwan NPP, Atomenergomash said on …
Nuclear Power Plant
Atommash Assembles Lower half of Reactor for Tianwan 7
The Volgodonsk branch of Atommash AEM-Technologies has assembled the lower half-shell of the reactor for unit 7 of China’s Tianwan NPP, Atomenergomash said on …
China
Chinese Company Contracted to Work on Tianwan 7&8
The two units, with VVER-1200 reactors, are being built by Rosatom, which said work on unit 7 should begin in May 2021, and on unit 8 in March 2022.